Project overview

The City of Englewood is in the process of a multistage infrastructure project to update E. Hampden Ave. to improve utility services under the road and make the area more accessible to pedestrians and vehicles.

Current Phase: Phase 4A Construction Update

During Phase 4A, valet access to both the 601 and 701/799 Buildings is temporarily blocked due to ongoing construction.

For Patients Visiting the 601 Building:

  • Valet and drop-off services are now redirected through the 501 Building main drive.
  • Use the right lane for 601 valet/drop-off; 501 valet/drop-off will use the left lane.
  • valet team member will be stationed at the 501 drive to assist and direct traffic between both areas.

For Patients Visiting the 701/799 Buildings:

  • The circle drive next to the Serenity Garden (accessible via S Clarkson St.) is reserved for ADA patients and guests only. Valet service is available at this location.
  • All other patients and visitors should park in the East Garage.
  • Directional signage is posted to guide traffic to the East Garage via S Clarkson Street.

Coming Soon: Phase 4B

Phase 4B will further impact access to the 701/799 valet areas and will include a temporary closure of S Clarkson Street.

Key Changes:

  • Valet service will remain available and strongly encouraged.
  • Access to the usual valet areas for 701/799 will be blocked due to road work.
  • Passthrough lanes in the East Garage (P4) will stay open to allow ADA drop-off and pick-up at the Serenity Garden circle.
  • All other patients and visitors should continue to park in the East Garage.